Filters
Filters (2 applied)
Clear All-
type (1)
-
has image (1)
-
has sound (1)
-
has video (1)
-
Conflict (1)
-
related places (10)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Jaba River Area (11)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville (10)
- Oceania: Pacific Islands, Solomon Islands, Bougainville (4)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, Central Bougainville, Torokina (4)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Puriata River Area, Toko (4)
- Oceania: Australia, Queensland, Brisbane, Pine River (3)
- Oceania: Australia, Queensland, Brisbane, Kelvin Grove (2)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Adele River Area (1)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Tavera River Area (1)
- Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Tuju River Area (1)
Collection
21 Results
-
BOUGAINVILLE. 1945-05-30. A JEEP CROSSING THE ADELE RIVER ON A PILE DRIVER BRIDGE CONSTRUCTED BY ...
Photograph
BOUGAINVILLE. 1945-05-30. A JEEP CROSSING THE ADELE RIVER ON A PILE DRIVER BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS. THREE-TON VEHICLES LOADED WITH STORES CAN NOW COMPLETE THE...092677
-
BOUGAINVILLE. 1945-05-30. A JEEP CROSSING THE BOX GIRDER BRIDGE OVER THE TAVERA RIVER CONSTRUCTED ...
Photograph
BOUGAINVILLE. 1945-05-30. A JEEP CROSSING THE BOX GIRDER BRIDGE OVER THE TAVERA RIVER CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS. ALL THE BRIDGES ON THE TOROKINA-TOKO ROAD HAVE BEEN RE...092676
-
BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA ...
Photograph
BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA RIVER WHICH WAS ASSEMBLED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, TO REPLACE A BRIDGE WASHED OUT...092667
-
BOUGAINVILLE. 1945-05-30. PATROL GRADER AND JEEP CROSSING THE TUJU BRIDGE CONSTRUCTED BY MEMBERS ...
Photograph
BOUGAINVILLE. 1945-05-30. PATROL GRADER AND JEEP CROSSING THE TUJU BRIDGE CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS. THE BRIDGE IS ON THE COAST ROAD FROM TOKO TO TOROKINA, ...092673
-
BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE ...
Photograph
BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE DRIVER ERECTED ON PONTOONS TO DRIVE PILES TO ANCHOR THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIV...092668
-
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ...
Photograph
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, OPENS...092669
-
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING ...
Photograph
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD...092670
-
CALOUNDRA, QLD. C. 1940-05. A CAMP OF THE 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), ...
Photograph
CALOUNDRA, QLD. C. 1940-05. A CAMP OF THE 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), ON CURRIMUNDI CREEK, WITH THE COMMENCEMENT OF A BRIDGE WITH LOG ABUTMENT, ONE CRIBB PIER, FIXED PIERS OV...P01105.023
-
KELVIN GROVE, QLD. C. 1938. MEMBERS OF 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), WITH ...
Photograph
KELVIN GROVE, QLD. C. 1938. MEMBERS OF 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), WITH A COMPLETELY ASSEMBLED MK2 SMALL BOX GIRDER BRIDGE WITH LAUNCHING NOSE AND WHEEL ATTACHED, TO BE USED ...P01105.001
-
KELVIN GROVE, QLD. C. 1938. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), COMPLETING ...
Photograph
KELVIN GROVE, QLD. C. 1938. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), COMPLETING CONSTRUCTION OF A MK2 SMALL BOX GIRDER BRIDGE AT THEIR DRILL HALL. LIEUTENANT J. C. SAINT-SMITH STANDS RIGH...P01105.002
-
PINE RIVER, QLD. C. 1940-12. A KAPOK INFANTRY ASSAULT BRIDGE CONSTRUCTED BY 11TH FIELD COMPANY, ...
Photograph
PINE RIVER, QLD. C. 1940-12. A KAPOK INFANTRY ASSAULT BRIDGE CONSTRUCTED BY 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), IN CAMP NEAR PETRIE. (DONOR: G. LOVELY)P01105.014
-
PINE RIVER, QLD. C. 1940-12. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), IN CAMP NEAR ...
Photograph
PINE RIVER, QLD. C. 1940-12. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), IN CAMP NEAR PETRIE FOR TRAINING IN FOLDING BOAT EQUIPMENT (FBE). THE SHORE BAY OF THE BRIDGE STRETCHED FROM THE RIVE...P01105.011
-
PINE RIVER, QLD. C. 1940-12. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), IN CAMP NEAR ...
Photograph
PINE RIVER, QLD. C. 1940-12. 11TH FIELD COMPANY, RAE (ROYAL AUSTRALIAN ENGINEERS), IN CAMP NEAR PETRIE ABOUT TO LAUNCH A KAPOK INFANTRY ASSAULT BRIDGE. (DONOR: G. LOVELY)P01105.013
-
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ON THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. CONSTRUCTED IN FIVE WEEKS, THE BRIDGE MEASURES 620 FEE...092594
-
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, CONSTRUCTING SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. PILE DRIVING FRAMES MOUNTED ON PONTOON RAFTS ARE AT WORK B...092592
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092599
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092596
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092598
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092595
-
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IN FIVE WEEKS, THE BRIDGE MEASURE...092593