Filters
Filters (2 applied)
Clear All- related places : Oceania: Pacific Islands, Solomon Islands, Bougainville, South Bougainville, Jaba River Area (remove)
- related subjects : Bridge construction (remove)
-
type (1)
-
has image (1)
-
has sound (1)
-
has video (1)
-
Conflict (1)
-
related units (3)
Collection
18 Results
-
BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA ...
Photograph
BOUGAINVILLE. 1945-05-30. A NEWLY CONSTRUCTED SAVIGE COMMERCIAL BOX GIRDER BRIDGE OVER THE JABA RIVER WHICH WAS ASSEMBLED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, TO REPLACE A BRIDGE WASHED OUT...092667
-
BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE ...
Photograph
BOUGAINVILLE. 1945-05-30. SAPPERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, USING A PILE DRIVER ERECTED ON PONTOONS TO DRIVE PILES TO ANCHOR THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIV...092668
-
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ...
Photograph
BOUGAINVILLE. 1945-05-30. THE SAVIGE BRIDGE CONSTRUCTED BY 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD AGAINST FLOOD WATERS, OPENS...092669
-
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING ...
Photograph
BOUGAINVILLE. 1945-05-30. VEHICLES OF 2/11 FIELD REGIMENT, ROYAL AUSTRALIAN ENGINEERS, CROSSING THE NEWLY CONSTRUCTED SAVIGE BRIDGE OVER THE JABA RIVER. THIS BRIDGE, MEASURING 620 FEET LONG AS A GUARD...092670
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. ENGINEERS OF THE 23RD FIELD COMPANY, WORKING ON ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. ENGINEERS OF THE 23RD FIELD COMPANY, WORKING ON THE NEW TIMBER PILE BRIDGE ACROSS THE JABA RIVER WATCHING THE OLD PONTOON FERRY TRANSPORTING AN ARMY 3 ...078664
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. NX162279 CORPORAL D.P. COOPER, 23RD FIELD ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. NX162279 CORPORAL D.P. COOPER, 23RD FIELD COMPANY, USING A COMPRESSED AIR DRILLING MACHINE DURING THE BUILDING OF A WOODEN PILE BRIDGE ACROSS THE JABA ...078662
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD COMPANY, WORKING ON THE ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD COMPANY, WORKING ON THE CONSTRUCTION OF A PERMANENT TIMBER PILE BRIDGE ACROSS THE JABA RIVER. THE PONTOON FERRY WHICH IS TO BE REPL...078663
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD FIELD COMPANY FERRYING PILES ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD FIELD COMPANY FERRYING PILES OUT TO THE SITE OF THE NEW PERMANENT BRIDGE WHICH THE UNIT IS BUILDING ACROSS THE JABA RIVER.078666
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD FIELD COMPANY, WORKING ON ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. SAPPERS OF THE 23RD FIELD COMPANY, WORKING ON THE CONSTRUCTION OF A NEW TIMBER PILE BRIDGE OVER THE JABA RIVER.078667
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. TROOPS OF THE 23RD FIELD COMPANY, DRIVING PILES ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. TROOPS OF THE 23RD FIELD COMPANY, DRIVING PILES FOR A PERMANENT BRIDGE ACROSS THE JABA RIVER.078661
-
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. TROOPS OF THE 23RD FIELD COMPANY, PLACING A ...
Photograph
MOTUPENA POINT, BOUGAINVILLE ISLAND, 1945-01-26. TROOPS OF THE 23RD FIELD COMPANY, PLACING A STRINGER IN POSITION NEAR THE UNIT PILE DRIVER AND CRANE WORKING FROM THE NORTH SIDE OF THE JABA RIVER DURI...078665
-
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. ENGINEERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, WORKING ON THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. CONSTRUCTED IN FIVE WEEKS, THE BRIDGE MEASURES 620 FEE...092594
-
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, CONSTRUCTING SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER. PILE DRIVING FRAMES MOUNTED ON PONTOON RAFTS ARE AT WORK B...092592
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092599
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092596
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092598
-
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. ...
Photograph
SOUTH BOUGAINVILLE, 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER ALMOST COMPLETED. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IT WAS COMPLETED IN FIVE WEEKS AND ...092595
-
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. ...
Photograph
SOUTH BOUGAINVILLE. 1945-05-27. THE SAVIGE BRIDGE OVER THE JABA NO. 1 RIVER NEARING COMPLETION. CONSTRUCTED BY MEMBERS OF 11 FIELD COMPANY ROYAL AUSTRALIAN ENGINEERS, IN FIVE WEEKS, THE BRIDGE MEASURE...092593